The first 90 days after the licence
The licence date is a starting gun. The first ninety days either inherit a system for one workflow or a mess.
Part of Digital Asset Operations(14)
The licence date is a starting gun, not a finish line.
In the first 90 days, volume either inherits a system or a mess. Hiring will not finish in time. Vendors will not wire themselves. Counsel will not run dual control.
If you are already licensed
Put production in place for one workflow before you celebrate the second product line. Start with a Solution Definition Sprint, then configure the operating application in an AI Production Sprint.
If you are still applying
Counsel owns the licence. Any day-one operational design (RACI, dual-control model, evidence design) happens as a counsel-led engagement. It is not filing, not opinions, and not “we get you licensed.”
If you just became CCO
Your first ninety days are the cheapest moment to make the work item the evidence and to put in dual control that survives Tuesday. After that, workarounds harden into habits.
Next step: Congratulations posts are cheap. A named workflow is worth more. Bring it to us.
Fence: We do not obtain licences. Counsel does.